Steel formwork in Bali: building a villa floor in 1–2 weeks

In Bali, concrete walls are usually cast in timber formwork. A Chinese company is preparing a plant in Sanur for reusable steel formwork. Andrey Fedotov spoke to them at a forum and explains what this changes on a building site.

In short. Cast-in-place concrete walls in Bali are usually poured into timber formwork. It is nailed together on site and goes in the skip after a couple of pours. A Chinese company is preparing a plant in Sanur for reusable steel formwork. According to the company, the formwork for one floor of a villa goes up in a day, and the floor, with pipes and wiring already inside the walls, is ready in one to two weeks. The company does not sell houses; it is a supplier, in other words infrastructure: any builder on the island will be able to order this formwork. The plant is still being prepared, so real timelines and costs will only become clear on the first projects.

Steel formwork panels with locks and stiffening ribs

What the developer says

Andrey Fedotov with a microphone in the forum exhibition hall
Andrey Fedotov at the Indonesia — China Bridge Forum. Frame from his video, November 2026

Andrey's two main takeaways from the conversation, in his words:

"In a week or two you get a finished floor of a villa."
"In Bali we run into this rework all the time: redoing, finishing off, workers leave, the job is done badly."

What formwork is, and why it is timber in Bali

Formwork is the mould that concrete is poured into. The concrete sets, the mould comes off, and you are left with a wall, a column or a slab. It decides how straight the wall turns out and how much plastering and fixing it needs afterwards.

In Bali, formwork is most often built from boards and plywood right on the plot. It is cheap to start with and familiar to local crews. But timber has drawbacks: it swells with moisture, the panels shift, the joints come out uneven, and after a few pours the formwork is thrown away. It is rebuilt from scratch for every floor.

What was shown at the forum

Steel formwork is a set of ready-made panels with locks and stiffening ribs. They are not nailed together but assembled like a construction kit, following a design prepared in advance. After the pour, the panels are taken down and moved to the next site.

Steel formwork panels with locks and stiffening ribs
Steel formwork on the forum stand. Frame from Andrey Fedotov's video, November 2026

Andrey explains how the company works. It prepares the drawings itself, plans all the building services in advance and sets them into the walls before the pour. The formwork for one floor of a villa goes up in a day, it is filled with concrete together with the pipes and wiring, left until the concrete gains strength, and then taken down. The next floor can then go on top.

The company is preparing the plant in Sanur and plans to open it. We will name the company and the launch date once there is official information.

What it changes on site

The main thing Andrey sees is less rework. In Bali that is a sore point. When the walls, pipes and wiring are done by one contractor to one design, there is less work improvised on site. That means fewer places where something can be forgotten, shifted or done crooked. We covered how to spot these mistakes in a finished villa in Hidden defects: how to tell a well-built villa in Bali.

On price, the company says it will not cost more than a standard build in Bali. Andrey thinks that is possible, but we would check it against a specific cost estimate: a lot depends on the design, logistics, and how many floors and identical houses are in the order.

Pros and limitations

What steel formwork can offer:

  • a faster shell: one floor in one to two weeks instead of rebuilding the formwork for every pour;
  • straighter walls and corners, less plastering and fixing;
  • services are set in place to the design before the pour, rather than cutting channels into the walls later;
  • less waste: the panels are reused on many sites.

What to keep in mind:

  • you need an accurate design up front. Changing the layout mid-build is harder than with timber;
  • you need a trained crew that knows how to assemble the system;
  • a fast shell is not a fast villa. Finishing, the roof, the pool and the garden all take their own time;
  • the plant is not open yet, and there is no track record on Bali sites so far.

What it means for buyers

The new tool will be available to all builders at once. Any company on the island will be able to use it, as long as it builds in cast concrete and has a finished design.

What a buyer should ask the developer:

  1. What are the walls made of: cast concrete, blockwork or timber?
  2. What formwork do you use, and who assembles it?
  3. When do the pipes and wiring go in: before the pour, or cut into the walls afterwards?
  4. Can I see the site at the shell stage?

We showed the whole process from foundations to handover in How to build a villa in Bali from scratch. For a different approach, timber houses, see Wooden villas in Bali: how they are built and whether they are worth it.

The stage of the Indonesia — China Bridge Forum in Bali
The stage of the Indonesia — China Bridge Forum. Frame from the video, November 2026

The numbers

What

Value

Source

Setting up formwork for one villa floor

1 day

the company, as reported by Andrey Fedotov, video of November 2026

Finished floor with services inside the walls

1–2 weeks

same

Plant location

Sanur, Bali, being prepared to open

same

FAQ

What is steel formwork?

Reusable steel panels into which concrete is poured for walls and slabs. After the pour they are taken down and used on the next site.

How is it better than timber?

It goes up faster, gives straighter walls and lasts for many uses. In Bali, timber formwork is usually built on site and thrown away after a few pours.

Is this a Chinese developer?

No. It is a supplier of formwork and ready-made solutions for cast concrete. Any developer in Bali can use it.

Will villas get cheaper?

The company says it will not cost more than a standard build. That can only be checked against the estimate for a specific project once the plant is running.

Related properties

Find a property

Want to see how our villas in Sanur are built? We will show you the Villa Garis site in person or on a video call and explain what it is made of and how.